Applying for a Building Addition Permit

Planning to add a new room or extend your home in Thailand? Even small additions can require a legal permit. This guide explains the definition of a "building addition" under Thai law, outlines the crucial steps for applying for a permit, and details the necessary documents to ensure your project is safe, compliant, and avoids costly legal issues from the start.

1. Legal Definition of a Building Addition

A building addition is the process of adding more usable space or new components to an existing building, which may include building an extra room, extending a balcony, or adding an awning. Although it may seem like a minor change, if the size or characteristics fall under the legal definition, you are required to apply for an "addition" permit. This ensures your actions comply with the law and helps you avoid future problems.

According to the Building Control Act, B.E. 2522 (and its amendments), an "addition" refers to increasing the area or components of a building, which may affect the structure or appearance of the building, such as:

  • Increasing the area of any floor: e.g., building a new bedroom on the second floor, expanding a living room, or constructing an additional kitchen.
  • Increasing the number of floors: Creating a mezzanine or adding a story to the building (e.g., from 2 stories to 3 stories).
  • Increasing or decreasing the number of columns or beams: To support the added weight from the addition, or to modify the structure.
  • Adding a roof or building cover: e.g., constructing a carport roof, a roof over a laundry area, or an awning with an area exceeding 5 square meters (for residences) or that affects the structural load.
  • Constructing non-structural building components, Such as walls, floors, or roofs, that are added to the original building.

Important Note: A key point to consider is that a very small addition may be exempted under the Building Control Act, which provides exceptions for "minor modifications" or "minor additions" that do not require a permit. An example is adding usable residential space that totals no more than 5 square meters. However, in practice, interpreting whether an action falls under this exemption can be complex. It is advisable to consult a building law expert or inquire with local district officials to be certain and prevent problems later.

Furthermore, adding space often involves modifying the original building's structure, such as changing the position of beams, columns, or walls. In such cases, even if the area expansion is not large, it may be necessary to apply for both a modification and an addition permit simultaneously.

2. Directly Related Laws and Regulations

Building additions must be carried out within the framework of the Building Control Act and related urban planning laws, which have important details to consider:

First is the Building Control Act, B.E. 2522 (and its amendments), which is the primary law governing the construction, modification, and addition of buildings. It requires building owners to apply for a permit from local officials unless the action falls under a legally specified exemption.

Next are the Ministerial Regulations issued under the Building Control Act, which provide technical details and safety standards, such as building setbacks, height, ventilation systems, lighting, and fire protection. The added area must comply with these standards, just like a new building.

Additionally, regulations from the Comprehensive Urban Plan must be considered, as they directly affect the added area in certain aspects, such as:

  • Floor Area Ratio (FAR): If the addition causes the total building area to exceed the specified ratio.
  • Open Space Ratio (OSR): If the addition reduces the open space below the legally required ratio.
  • Setback: The added part must maintain the required distance from property lines, roads, or adjacent buildings according to regulations.

Finally, do not neglect Local Ordinances, Municipal Ordinances, or Bangkok Metropolitan Administration Regulations. Each area may have additional or specific restrictions regarding building additions, such as permitted building styles, material colors, or area-specific prohibitions. Therefore, you should check with the district office or local administrative organization before proceeding.

3. The Process of Applying for a Building Addition Permit

The process for applying for a building addition permit generally consists of several steps that should be followed systematically to ensure legal compliance and reduce the risk of work being suspended later.

It begins with assessing the scope of the addition and determining whether a permit application is required. You should consult an architect or engineer to help analyze the nature of the work, whether it is an "addition" or "modification" subject to legal regulations. You should also check for restrictions related to the original building and the land, such as setbacks, urban planning, and area-specific laws.

The next step is hiring an architect and engineer, who are responsible for designing the addition, surveying the condition of the original building's structure, and preparing plans with supporting documents, such as structural calculations (in cases of added weight or changes to the original structure). The professionals responsible must have a professional license and must sign and certify the plans.

Once the plans and documents are complete, the building owner must prepare the documents for the permit application, which include:

  • Land title documents
  • The building owner's ID card and house registration
  • Original building plans (if any)
  • The addition plans are certified by the architect and engineer

Then, submit the permit application to the local official using Form Khor.1, along with all documents, at the District Office, Municipality, or Sub-district Administrative Organization (SAO) where the building is located.

After submission, the official will review the documents and plans to ensure they are correct according to the law. If there are defects or necessary revisions, the official will notify the applicant to make the required corrections.

Upon approval, the applicant must pay the fee, which is often calculated based on the added area. Once paid, the official will issue a written Building Addition Permit (Or.1).

The final step is to notify of the commencement of the addition. The owner should inform the local official before the actual construction work begins to demonstrate transparency and to follow the correct legal procedures.

4. Documents Required for a Building Addition Permit Application

Preparing a complete set of documents is a crucial step that helps the permit process go smoothly. The main documents required are as follows:

4.1 Plans showing the original building and the addition

  • Architectural Plans: Floor plans, elevations, and sections of both the original building and the addition (must specify the changed or added parts).
  • Structural Plans and Calculations (in case of added weight or changes to the original structure).
  • Various System Plans, such as electrical, sanitary, or other systems (in case of new installations or significant changes to the original systems).

4.2 Land Title and Personal Documents

  • Copy of the Land Title Deed or other relevant title documents (all pages certified as true copies).
  • Copy of the ID Card and House Registration of the applicant.
  • If the applicant is not the landowner, a Power of Attorney and a Letter of Consent from the Landowner must be attached.

4.3 Certification from Professionals

  • Architect: Responsible for the architectural design work.
  • Civil Engineer: Responsible for the design and structural calculations (in case of structural work).
  • Additional supporting documents include a copy of the professional license and a letter certifying membership in the relevant professional council.

4.4 Other Supporting Documents

  • Photographs of the building in its current state (to show the context before the addition).
  • Copy of the original building construction permit (if any).

5. Approximate Processing Time and Fees

The processing time for a building addition permit application is generally around 30 to 45 working days. This depends on the complexity of the design and the workload of the officials in each area. In some cases involving re-checking of documents or additional revisions, it may take longer.

As for the permit issuance fee, it is calculated based on the size of the area being added, using the rates specified in the relevant ministerial regulations. To find out the exact amount, you should inquire at the district office or local authority in the area where the building is located, as each locality might have slightly different calculation methods or minor details.

6. Precautions and Things to Know Before Starting an Addition

  • Clear Definition of "Addition": Make sure the work you want to do falls under the legal definition of "addition" to apply for the permit correctly. Misunderstanding can lead to proceeding without a permit and subsequent problems.
  • Impact on the Original Structure: An addition can affect the weight or stability of the original structure. It should be carefully considered and certified by an engineer.
  • Setbacks and Urban Planning: The added part must comply with setback requirements from property lines and neighbors, as well as the FAR/OSR regulations of the urban plan. If the addition causes the total building area to exceed the FAR or reduces the open space below the required OSR, it may not be permitted.
  • Water and Lighting Issues: If the addition is built close to a neighbor's property line, you must consider rainwater drainage or the blocking of sunlight/ventilation for the neighbor, which could lead to disputes.
  • Consent from Neighbors/Juristic Person: If the addition directly affects a neighbor (e.g., construction close to the property line) or if the building is in a housing estate/condominium, a letter of consent from the neighbor or from the juristic person/project owner should be obtained before proceeding.
  • Choice of Materials: You should choose appropriate and standard-compliant materials for the strength, durability, and safety of the added section.

7. Scenario Example: The Home Additions of "Uncle Chai" and "Aunt Nid"

  • Uncle Chai: The owner of a townhouse in a housing estate. He is impatient and acts quickly.
  • Aunt Nid: Uncle Chai's neighbor, living in the same type of house. She is cautious and likes to research before taking action.

Uncle Chai's Case: The Dream Kitchen That Became a Nightmare

  • The Need: Uncle Chai wanted a large Thai-style kitchen, so he decided to add on to the entire back area of his house to create a closed kitchen, with piles driven and permanent concrete walls.
  • The Action: He hired his regular contractor, who told him, "It's our backyard, no one will see. No need for a permit, Uncle." Uncle Chai immediately started construction without notifying anyone, building almost right up to the back wall.
  • The Problem: The juristic person of the housing estate came to inspect and found that Uncle Chai's addition clearly violated the estate's regulations and also violated the Building Control Act regarding setbacks from the property line.
  • The Result: The juristic person filed a complaint with the Municipality. An official came to inspect and issued an order to suspend and demolish the illegal addition. Uncle Chai lost all the money he had spent on construction and had to pay for the demolition as well.

Aunt Nid's Case: The Home Office That Started Correctly

  • The Need: Aunt Nid wanted to add a small home office on the ground floor and build a roof over her carport at the front of the house.
  • The Correct Procedure:
    1. Consult the Juristic Person: The first thing Aunt Nid did was go to the juristic person's office to ask about the estate's rules for additions to understand the initial limitations.
    2. Hire an Architect: Aunt Nid hired an architect to design the addition, emphasizing that it must comply with both the estate's rules and all laws.
    3. Obtain Consent: Once she had a draft plan, she took it to the juristic person for review and to sign a Letter of Consent for the addition.
    4. Apply for a Permit: The architect gathered all the documents, including the letter of consent from the juristic person, and submitted an application for an addition permit (Form Khor 1) to the municipality officially.
  • The Result: After receiving the permit, Aunt Nid began construction. The work went smoothly with no complaints, and when it was finished, she had more usable space that was legal, safe, and worry-free.

Conclusion from the Scenarios: The stories of these two individuals show that even a "small" addition can be illegal if not properly researched. Starting correctly, like Aunt Nid, by consulting experts and following the procedures—both the rules of the juristic person and the government's laws—is the key to ensuring that your addition of a happy space doesn't become a bigger problem in the future.

8. Conclusion

A building addition, even if it's just adding a small amount of space, involves legal complexities and regulations that must be carefully considered. From setback requirements, the impact on the original structure, the rules of the juristic person of the housing estate, to local ordinances. Deciding to proceed without study or consultation with experts carries a high risk. Therefore, proper planning from the beginning is not a burden, but a way to guarantee that the space of happiness you've added will be an asset that increases in value and truly gives you peace of mind in the long term.

References

  • Building Control Act, B.E. 2522 (พระราชบัญญัติควบคุมอาคาร พ.ศ. 2522)
  • The Urban Planning Act (พระราชบัญญัติการผังเมือง)
  • Relevant Ministerial Regulations and Local Ordinances.

Planning to add a new room or extend your home in Thailand? Even small additions can require a legal permit. This guide explains the definition of a "building addition" under Thai law, outlines the crucial steps for applying for a permit, and details the necessary documents to ensure your project is safe, compliant, and avoids costly legal issues from the start.

1. Legal Definition of a Building Addition

A building addition is the process of adding more usable space or new components to an existing building, which may include building an extra room, extending a balcony, or adding an awning. Although it may seem like a minor change, if the size or characteristics fall under the legal definition, you are required to apply for an "addition" permit. This ensures your actions comply with the law and helps you avoid future problems.

According to the Building Control Act, B.E. 2522 (and its amendments), an "addition" refers to increasing the area or components of a building, which may affect the structure or appearance of the building, such as:

  • Increasing the area of any floor: e.g., building a new bedroom on the second floor, expanding a living room, or constructing an additional kitchen.
  • Increasing the number of floors: Creating a mezzanine or adding a story to the building (e.g., from 2 stories to 3 stories).
  • Increasing or decreasing the number of columns or beams: To support the added weight from the addition, or to modify the structure.
  • Adding a roof or building cover: e.g., constructing a carport roof, a roof over a laundry area, or an awning with an area exceeding 5 square meters (for residences) or that affects the structural load.
  • Constructing non-structural building components, Such as walls, floors, or roofs, that are added to the original building.

Important Note: A key point to consider is that a very small addition may be exempted under the Building Control Act, which provides exceptions for "minor modifications" or "minor additions" that do not require a permit. An example is adding usable residential space that totals no more than 5 square meters. However, in practice, interpreting whether an action falls under this exemption can be complex. It is advisable to consult a building law expert or inquire with local district officials to be certain and prevent problems later.

Furthermore, adding space often involves modifying the original building's structure, such as changing the position of beams, columns, or walls. In such cases, even if the area expansion is not large, it may be necessary to apply for both a modification and an addition permit simultaneously.

2. Directly Related Laws and Regulations

Building additions must be carried out within the framework of the Building Control Act and related urban planning laws, which have important details to consider:

First is the Building Control Act, B.E. 2522 (and its amendments), which is the primary law governing the construction, modification, and addition of buildings. It requires building owners to apply for a permit from local officials unless the action falls under a legally specified exemption.

Next are the Ministerial Regulations issued under the Building Control Act, which provide technical details and safety standards, such as building setbacks, height, ventilation systems, lighting, and fire protection. The added area must comply with these standards, just like a new building.

Additionally, regulations from the Comprehensive Urban Plan must be considered, as they directly affect the added area in certain aspects, such as:

  • Floor Area Ratio (FAR): If the addition causes the total building area to exceed the specified ratio.
  • Open Space Ratio (OSR): If the addition reduces the open space below the legally required ratio.
  • Setback: The added part must maintain the required distance from property lines, roads, or adjacent buildings according to regulations.

Finally, do not neglect Local Ordinances, Municipal Ordinances, or Bangkok Metropolitan Administration Regulations. Each area may have additional or specific restrictions regarding building additions, such as permitted building styles, material colors, or area-specific prohibitions. Therefore, you should check with the district office or local administrative organization before proceeding.

3. The Process of Applying for a Building Addition Permit

The process for applying for a building addition permit generally consists of several steps that should be followed systematically to ensure legal compliance and reduce the risk of work being suspended later.

It begins with assessing the scope of the addition and determining whether a permit application is required. You should consult an architect or engineer to help analyze the nature of the work, whether it is an "addition" or "modification" subject to legal regulations. You should also check for restrictions related to the original building and the land, such as setbacks, urban planning, and area-specific laws.

The next step is hiring an architect and engineer, who are responsible for designing the addition, surveying the condition of the original building's structure, and preparing plans with supporting documents, such as structural calculations (in cases of added weight or changes to the original structure). The professionals responsible must have a professional license and must sign and certify the plans.

Once the plans and documents are complete, the building owner must prepare the documents for the permit application, which include:

  • Land title documents
  • The building owner's ID card and house registration
  • Original building plans (if any)
  • The addition plans are certified by the architect and engineer

Then, submit the permit application to the local official using Form Khor.1, along with all documents, at the District Office, Municipality, or Sub-district Administrative Organization (SAO) where the building is located.

After submission, the official will review the documents and plans to ensure they are correct according to the law. If there are defects or necessary revisions, the official will notify the applicant to make the required corrections.

Upon approval, the applicant must pay the fee, which is often calculated based on the added area. Once paid, the official will issue a written Building Addition Permit (Or.1).

The final step is to notify of the commencement of the addition. The owner should inform the local official before the actual construction work begins to demonstrate transparency and to follow the correct legal procedures.

4. Documents Required for a Building Addition Permit Application

Preparing a complete set of documents is a crucial step that helps the permit process go smoothly. The main documents required are as follows:

4.1 Plans showing the original building and the addition

  • Architectural Plans: Floor plans, elevations, and sections of both the original building and the addition (must specify the changed or added parts).
  • Structural Plans and Calculations (in case of added weight or changes to the original structure).
  • Various System Plans, such as electrical, sanitary, or other systems (in case of new installations or significant changes to the original systems).

4.2 Land Title and Personal Documents

  • Copy of the Land Title Deed or other relevant title documents (all pages certified as true copies).
  • Copy of the ID Card and House Registration of the applicant.
  • If the applicant is not the landowner, a Power of Attorney and a Letter of Consent from the Landowner must be attached.

4.3 Certification from Professionals

  • Architect: Responsible for the architectural design work.
  • Civil Engineer: Responsible for the design and structural calculations (in case of structural work).
  • Additional supporting documents include a copy of the professional license and a letter certifying membership in the relevant professional council.

4.4 Other Supporting Documents

  • Photographs of the building in its current state (to show the context before the addition).
  • Copy of the original building construction permit (if any).

5. Approximate Processing Time and Fees

The processing time for a building addition permit application is generally around 30 to 45 working days. This depends on the complexity of the design and the workload of the officials in each area. In some cases involving re-checking of documents or additional revisions, it may take longer.

As for the permit issuance fee, it is calculated based on the size of the area being added, using the rates specified in the relevant ministerial regulations. To find out the exact amount, you should inquire at the district office or local authority in the area where the building is located, as each locality might have slightly different calculation methods or minor details.

6. Precautions and Things to Know Before Starting an Addition

  • Clear Definition of "Addition": Make sure the work you want to do falls under the legal definition of "addition" to apply for the permit correctly. Misunderstanding can lead to proceeding without a permit and subsequent problems.
  • Impact on the Original Structure: An addition can affect the weight or stability of the original structure. It should be carefully considered and certified by an engineer.
  • Setbacks and Urban Planning: The added part must comply with setback requirements from property lines and neighbors, as well as the FAR/OSR regulations of the urban plan. If the addition causes the total building area to exceed the FAR or reduces the open space below the required OSR, it may not be permitted.
  • Water and Lighting Issues: If the addition is built close to a neighbor's property line, you must consider rainwater drainage or the blocking of sunlight/ventilation for the neighbor, which could lead to disputes.
  • Consent from Neighbors/Juristic Person: If the addition directly affects a neighbor (e.g., construction close to the property line) or if the building is in a housing estate/condominium, a letter of consent from the neighbor or from the juristic person/project owner should be obtained before proceeding.
  • Choice of Materials: You should choose appropriate and standard-compliant materials for the strength, durability, and safety of the added section.

7. Scenario Example: The Home Additions of "Uncle Chai" and "Aunt Nid"

  • Uncle Chai: The owner of a townhouse in a housing estate. He is impatient and acts quickly.
  • Aunt Nid: Uncle Chai's neighbor, living in the same type of house. She is cautious and likes to research before taking action.

Uncle Chai's Case: The Dream Kitchen That Became a Nightmare

  • The Need: Uncle Chai wanted a large Thai-style kitchen, so he decided to add on to the entire back area of his house to create a closed kitchen, with piles driven and permanent concrete walls.
  • The Action: He hired his regular contractor, who told him, "It's our backyard, no one will see. No need for a permit, Uncle." Uncle Chai immediately started construction without notifying anyone, building almost right up to the back wall.
  • The Problem: The juristic person of the housing estate came to inspect and found that Uncle Chai's addition clearly violated the estate's regulations and also violated the Building Control Act regarding setbacks from the property line.
  • The Result: The juristic person filed a complaint with the Municipality. An official came to inspect and issued an order to suspend and demolish the illegal addition. Uncle Chai lost all the money he had spent on construction and had to pay for the demolition as well.

Aunt Nid's Case: The Home Office That Started Correctly

  • The Need: Aunt Nid wanted to add a small home office on the ground floor and build a roof over her carport at the front of the house.
  • The Correct Procedure:
    1. Consult the Juristic Person: The first thing Aunt Nid did was go to the juristic person's office to ask about the estate's rules for additions to understand the initial limitations.
    2. Hire an Architect: Aunt Nid hired an architect to design the addition, emphasizing that it must comply with both the estate's rules and all laws.
    3. Obtain Consent: Once she had a draft plan, she took it to the juristic person for review and to sign a Letter of Consent for the addition.
    4. Apply for a Permit: The architect gathered all the documents, including the letter of consent from the juristic person, and submitted an application for an addition permit (Form Khor 1) to the municipality officially.
  • The Result: After receiving the permit, Aunt Nid began construction. The work went smoothly with no complaints, and when it was finished, she had more usable space that was legal, safe, and worry-free.

Conclusion from the Scenarios: The stories of these two individuals show that even a "small" addition can be illegal if not properly researched. Starting correctly, like Aunt Nid, by consulting experts and following the procedures—both the rules of the juristic person and the government's laws—is the key to ensuring that your addition of a happy space doesn't become a bigger problem in the future.

8. Conclusion

A building addition, even if it's just adding a small amount of space, involves legal complexities and regulations that must be carefully considered. From setback requirements, the impact on the original structure, the rules of the juristic person of the housing estate, to local ordinances. Deciding to proceed without study or consultation with experts carries a high risk. Therefore, proper planning from the beginning is not a burden, but a way to guarantee that the space of happiness you've added will be an asset that increases in value and truly gives you peace of mind in the long term.

References

  • Building Control Act, B.E. 2522 (พระราชบัญญัติควบคุมอาคาร พ.ศ. 2522)
  • The Urban Planning Act (พระราชบัญญัติการผังเมือง)
  • Relevant Ministerial Regulations and Local Ordinances.
//Blogs

Explore more inspiring interior reads

//Get in touch

Discuss your project with our design team

( 02 )
Share the project type, site, and main objective. Too.architects will help review the starting direction and suitable scope before design begins.